CN-224228682-U - Highway tunnel water-proof drainage system overhauls facility

CN224228682UCN 224228682 UCN224228682 UCN 224228682UCN-224228682-U

Abstract

The utility model relates to the technical field of tunnel overhaul, in particular to an overhaul facility of a highway tunnel waterproof and drainage system, which comprises a transverse channel, a vertical shaft section, a flat hole section, a longitudinal drain pipe and a drainage side ditch, wherein the transverse channel is transversely arranged on the side wall of the tunnel and is arranged in a plurality of intervals along the longitudinal direction of the tunnel, the vertical shaft section is arranged underground in the transverse channel, the upper opening end of the vertical shaft section is an overhaul inlet, the inlet is flush with the ground of the transverse channel, a movable cover plate is covered at the inlet, the flat hole section is connected to the lower end of the vertical shaft section and extends to a central drain ditch to penetrate the vertical shaft section and is respectively communicated with the longitudinal drain pipe and the drainage side ditch on an extending path.

Inventors

  • LI ZONGYAO
  • DONG ZHIMING
  • ZHENG TAO
  • YANG DIE
  • WANG DEBO
  • HUANG CHUAN
  • ZHU YUNFENG
  • JIA ZHENG
  • JIN JIANWEI

Assignees

  • 安徽六安和襄高速公路有限公司
  • 华杰工程咨询有限公司

Dates

Publication Date
20260512
Application Date
20250729

Claims (9)

  1. 1. A highway tunnel water protection and drainage system overhauls facility, characterized in that, it includes: the transverse channels are transversely arranged on the side wall of the tunnel and are arranged at intervals along the depth direction of the tunnel; The vertical shaft section is arranged under the ground of the transverse channel, the upper opening end is an access opening of the transverse channel, the access opening is level with the ground of the transverse channel, and the access opening is covered with a movable cover plate; the flat hole section is connected to the lower end of the vertical shaft section and extends to the central drainage ditch, and the flat hole section and the central drainage ditch are communicated and communicated with the longitudinal drainage pipe on an extending path; The gaskets are laid at the bottom of the flat hole section in a segmented way, bulges are arranged at the two sides of the flat hole section, the middle part of the gasket is provided with a groove to form a water passing channel, wherein a front section gasket is arranged below a position communicated with the longitudinal drain pipe, a rear section gasket is arranged at a position paved to the central drain ditch, and the inclination angles of the bulges at the two sides of the front section gasket are adjustable; The drainage pipeline is arranged on the inner sides of the flat hole section and the vertical shaft section, the water inlet end is communicated with the water passing channel of the rear section gasket, and the water outlet end extends to the transverse channel and is connected with the water diversion device in the transverse channel.
  2. 2. The apparatus for repairing a water-proof and drainage system of a highway tunnel according to claim 1, wherein the transverse channels of the upstream tunnel and the downstream tunnel are arranged at the same transverse position and are communicated to form an emergency channel.
  3. 3. The maintenance facility of a highway tunnel water-proof and drainage system according to claim 1, wherein the maintenance channels are arranged at intervals along the depth direction of the tunnel, and the distance between the two maintenance channels is smaller than 350m.
  4. 4. The apparatus of claim 1, wherein the longitudinal drain pipe passes through the side wall of the flat hole section and is communicated with the inner cavity of the flat hole section.
  5. 5. The maintenance facility of a highway tunnel water-proof and drainage system according to claim 1, wherein the gasket is a silica gel gasket with the hardness of 15-25A, an air bag is arranged in the bulge part of the front section gasket, and an air inlet of the air bag is positioned on the side wall of the gasket.
  6. 6. The maintenance facility of a highway tunnel water-proof and drainage system according to claim 2, wherein the water channel formed by paving gaskets in sections is obliquely arranged along the extending direction of the flat hole section, and the elevation of the bottom surface of the groove of the front-end gasket is higher than that of the bottom surface of the groove of the rear-end gasket.
  7. 7. The maintenance facility of a highway tunnel water-proof and drainage system according to claim 1, wherein the drainage pipeline in the flat hole section is buried under the gasket, and the water inlet end of the drainage pipeline extends to the joint of the front section gasket and the central drainage ditch and is communicated with the water channel at the joint.
  8. 8. The device for overhauling the water-proof and drainage system of the highway tunnel according to claim 1, wherein the inner walls of the raised parts on two sides of the gasket are obliquely arranged in a reverse taper shape from the top end to the bottom, the outer walls are attached to the side walls of the flat hole sections, and the top ends of the raised parts of the front-section gaskets are attached to the lower part of the through parts of the longitudinal drain pipes.
  9. 9. The maintenance facility for a highway tunnel water-proof and drainage system according to claim 3, wherein the water diversion device is a negative pressure water diversion bag or a water pump.

Description

Highway tunnel water-proof drainage system overhauls facility Technical Field The utility model relates to the technical field of tunnel overhaul, in particular to an overhaul facility of a highway tunnel water-proof and drainage system. Background The drainage structure is an important measure for guaranteeing the operation of a highway tunnel, substances carried by underground water flow can be deposited in a drain pipe and a drainage ditch, the highway tunnel is an underground hidden project, the quality control of the construction of the tunnel drainage project at the present stage is very difficult, the drainage ditch pipe is often subjected to construction quality problems such as discontinuous section, uneven ditch wall, construction waste blockage and the like, the blockage of a drainage system is further aggravated, a series of tunnel safety hazards are further caused, for example, the drain pipe is blocked to cause ponding in the tunnel, infiltrates into an illumination ventilation system and even erodes a tunnel concrete structure gap, the structural stability is weakened, therefore, the tunnel drainage system is required to be checked, maintained and dredged periodically, the reliability of the tunnel drainage system is guaranteed, and the safety and toughness of the tunnel operation are improved. Among the current tunnel structure, different waterproof and drainage structures have different maintenance modes, the drainage side ditch sets up in the road both sides, can directly open the apron and overhaul, vertical and hoop drain pipe is then through setting up the import in tunnel lateral wall department, overhaul by small-size maintenance robot, the center escape canal that is located the road surface below then sets up by the road surface downwards and examines and repair the well, overhaul through the manhole, but conventional manhole interval sets up on the traffic lane, during the detection, need manage the traffic, influence the tunnel and lead to the fact traffic safety hidden danger easily, and the entry of examining and repair the well mostly sets up in the road middle part, this setting position leads to its unable increase space, the operation space limitation in the well is unfavorable for intelligent check out equipment or detects the operation of car, be unfavorable for subsequent drainage pipeline mediation more. Therefore, the development of the road tunnel water-proof and drainage system maintenance facility not only has urgent research value, but also has good economic benefit and industrial application potential, which is the power place and foundation for the utility model. Disclosure of utility model The present inventors have conducted intensive studies to overcome the above-mentioned drawbacks of the prior art, and have completed the present utility model after a great deal of creative effort. Specifically, the technical problem to be solved by the utility model is to provide a road tunnel water-proof and drainage system maintenance facility so as to solve the technical problem of the existing road tunnel maintenance channel. In order to achieve the above purpose, the present utility model provides the following technical solutions: a highway tunnel water protection and drainage system service facility, the service facility comprising: the transverse channels are transversely arranged on the side wall of the tunnel and are arranged at intervals along the depth direction of the tunnel; The vertical shaft section is arranged under the ground of the transverse channel, the upper opening end is an overhaul inlet, the inlet is level with the ground of the transverse channel, and the inlet is covered with a movable cover plate; the flat hole section is connected to the lower end of the vertical shaft section and extends to the central drainage ditch, and the flat hole section and the central drainage ditch are communicated and communicated with the longitudinal drainage pipe on an extending path; The gaskets are laid at the bottom of the flat hole section in a segmented way, bulges are arranged at the two sides of the flat hole section, the middle part of the gasket is provided with a groove to form a water passing channel, wherein a front section gasket is arranged below a position communicated with the longitudinal drain pipe, a rear section gasket is arranged at a position paved to the central drain ditch, and the inclination angles of the bulges at the two sides of the front section gasket are adjustable; The drainage pipeline is arranged on the inner sides of the flat hole section and the vertical shaft section, the water inlet end is communicated with the water passing channel of the rear section gasket, and the water outlet end extends to the transverse channel and is connected with the water diversion device in the transverse channel. In the utility model, as an improvement, the transverse channels of the uplink tunnel and the downlink tunnel are arranged at the same tr